Back to All Solutions

Solution Detail

Pre-Release Automated Impairment Regression

ChaosBridge WAN Emulator + BestPerf Network Quality Measurement

Add common impairments, field fault profiles and key PCAPs to automated pipelines so every release undergoes network resilience testing.

Automated pre-release impairment regression pipeline

Products

4

Scenarios

6

Evidence

PCAP

Why

Requirements

Apps, media, cloud and edge services may pass on ideal office networks yet fail with regional paths, delay, jitter, loss, DNS variation and mobile handovers. Without pre-release impairment regression, users encounter these failures first.

ChaosBridge supplies scenarios, BestPerf supplies quality gates, Traffic Generation supplies production PCAPs and Flow Hunter supplies session/protocol evidence, making impairment testing a regular CI/CD stage.

Topology

Test and Deployment Topology

STEP 1CI/CD Pipeline
STEP 2ChaosBridge Impairment API
STEP 3Automated Application Tests
STEP 4BestPerf Quality Gate
STEP 5Flow Hunter Failure Evidence

How

Implementation

3

Replay Critical Production Traffic

Replay PCAPs that previously triggered faults to check whether new versions handle the same anomalies.

Product Stack

Core Emulator and Supporting Tools

Result

Expected Outcomes

Find Network Resilience Issues before Release

Trigger production-like failures during testing to reduce post-release complaints and rollbacks.

Add Field Faults to Regression Libraries

Turn each incident's quality profile and captures into long-term test assets.

Produce Reviewable Reports and Evidence

Deliver more than throughput or delay figures: include topology, parameters, timelines, quality curves, key sessions, anomalies, PCAP extracts and retest results. Development, testing, operations, vendors and customers can discuss the same evidence rather than relying on screenshots, verbal descriptions and repeated debate.

References

Related Standards and Methods

Next Step

Need to Apply This Solution to Your Network?

NetAccura can create a test topology, parameter table and POC plan based on your links, models, application protocols, available PCAPs and SLA goals.