Back to All Solutions

Production Link Solution

Financial Production-Link Delay Control

Independent Nanosecond Delay Controller

Install Delay Controller transparently inline as an independent production appliance, with defined change, rollback and acceptance processes for continuous deterministic delay.

Core Production-Link Equipment

Financial production-link nanosecond delay deployment diagram

Products

1

Scenarios

5

Evidence

PCAP

Why

Requirements

Trading access, market data, colocation and regional circuits require stable, auditable policies. Production needs include accuracy, transparent forwarding, independent directions, maintenance windows, fallback and long-term operation.

The FPGA data plane provides 0–10ms delay, nanosecond steps, ±7ns accuracy, 1ns path jitter, 1G–100G interfaces and 8 bidirectional channels. Specifications depend on model, packet size, load, measurement topology and delivered configuration.

Topology

Production Deployment Topology

STEP 1Trading or Market Data System
STEP 2Transparent Inline Delay Controller
STEP 3Production Circuit or Colocation Access
STEP 4Peer Trading System
STEP 5External Acceptance Measurement Point

How

Implementation

1

Map Production Links and Traffic Classes

Identify physical trading, market-data, colocation, inter-data-center and dedicated paths, interface speeds, optics, VLAN classes, redundancy and directional delay policies.

4

Accept Results with External Equipment

Use external measurement equipment with suitable resolution under agreed ports, frame sizes, load, observation points and methods. Archive conditions and results.

Product Stack

Core Production-Link Equipment

Result

Expected Outcomes

Run Stable Production-Link Policies Continuously

The hardware data plane provides deterministic delay according to explicit policies, reducing general-purpose software scheduling variation.

Define Changes and Rollback Clearly

Agree placement, traffic classes, maintenance windows, logs and fallback before deployment for manageable production operations.

Keep Acceptance Conditions Reviewable

Archive ports, packet sizes, load, measurement points and methods alongside results rather than quoting accuracy without conditions.

Next Step

Planning Production-Link Delay Control?

Provide your production topology, port speeds, VLAN and bidirectional policies, maintenance windows, rollback requirements and acceptance methods for model and deployment recommendations.